• Case Study

Gold mine switches to Watson-Marlow Qdos and Bredel APEX pumps

Gold mine switches to Watson-Marlow Qdos and Bredel APEX pumps

  • Qdos 30 delivers more accurate and consistent flow rate efficiency than electric –diaphragm pumps in reagent dosing
  • Company set to replace all eight diaphragm pumps in this application with Qdos 30
  • APEX 35 also adopted for thickener underflow task

A gold mining company with assets in one of the most prolific gold producing regions of Canada is now benefiting from the adoption of Qdos and APEX peristaltic pumps from Watson-Marlow Fluid Technology Solutions (WMFTS). Deployed in two important applications, Harte Gold Corporation is now enjoying far better flow rate efficiency, along with significant reductions in both maintenance requirements and downtime. The company is subsequently looking to invest in further pumps from WMFTS.

Harte Gold operates the wholly-owned Sugar Zone Mine, located on the Dayohessarah greenstone belt in Ontario. The mine entered commercial production in 2019 and has an anticipated operating life of approximately 13 years at current output levels. Producing 60,000 to 65,000 ounces of gold per year at 800 tpd (tons per day) throughput rate, a mine expansion study is currently in progress to support 1200 tpd.

Efficiency challenge

In the reagents room, Harte Gold operates eight diaphragm pumps on a 24-7 basis. However, issues over insufficient process efficiency, the amount of maintenance time needed to replace diaphragms and the potential for leaks, prompted the company to look at alternative solutions.

Harte Gold invited WMFTS to trial its Qdos 30 chemical metering pump. For a period of one month, the mining company compared the Qdos and an existing electric diaphragm pump dosing flotation reagents such as potassium amyl xanthate (PAX).

More consistent output

With a flow rate for PAX of 100-300 ml/min, the Qdos 30 significantly outperformed the diaphragm pump on flow rate efficiency. Although the dosage rates were adjusted as required before and during the trial, the Qdos outputs were noticeably more consistent in comparison with the existing pump, bringing potential for process optimisation.

ReNu peristaltic pumphead technology is at the core of the Qdos pump and is key to its success at Harte Gold. ReNu ensures accurate and repeatable chemical dosing and, thanks to its contained design with integral leak detection, reduces wastage and eliminates any potential for operator exposure to chemicals.

In addition, Harte Gold personnel confirmed that both operations and maintenance were trouble-free during the trial runs. Indeed, there were favourable reports of the colour TFT display which shows both flow and speed, while the maintenance team is in full support of the single, no tools ReNu pumphead replacement.

Such was the success of the trial that Harte Gold is now looking to gradually phase-out all eight of its existing diaphragm pumps in the reagents room over the coming few months. Although control of the first Qdos 30 on site is manual, the company will adopt 4-20mA I/O moving forward. Harte Gold is also planning to replace diaphragm pumps with Qdos models on the water treatment side of its business.

Golden performance

In another area of its operations, Harte Gold has replaced an existing peristaltic pump (not Watson-Marlow) with an APEX 35 in a 24/7 application. Here, the pump transfers thickened gravity concentrate from a gold decanting tank to a shaker table. However, the company found itself replacing hoses every week in its existing peristaltic pump.

New gold room decanter underflow duty:

  • Flow 0.67 m3/hr with 50% solids
  • Pressure 2 metre lift open to atmosphere and 2 metre flooded suction
  • Temperature 10-30C

Existing concentrated thickener underflow duty:

  • Flow 1.11 m3/hr with between 50 and 70% solids
  • Pressure 5 metre lift open to atmosphere and 2 metre flooded suction
  • Temperature 10-30C

The company already had an APEX 35 in operation so thought the same model would provide a good solution for the thickened gravity concentrate. Instead of one week hose life previously achieved, the APEX 35 with NR hose lasted for 12 weeks, reducing both maintenance and downtime in this critical application. Now, only four hoses are required per year, rather than 52, equating to a 1200%+ gain in maintenance intervals.

Related articles

Sign up to our newsletter and stay up to date with our latest news

Sign up now